The B&B team was contracted by the Town of Van Horn to perform design and construction management for the construction of a new 250,000-Gallon Potable Water Tank. The B&B surveying team performed a tank site field topographic and improvement survey and prepared a plat of topographic and improvement survey. A feasibility study was performed for the design of the Potable Water Tank. The design included a 10-inch supply water line to be connected to the ground tank as well a new 10-inch suction line to the booster station and the chloride injector line. Coordination with electrical engineers was required for the SCADA Control modifications.