B&B designed 1,100-LF of complex roadway extension with an elevated roundabout from Schuster Avenue to Paisano Drive (US-85) connecting through a new bridge over Interstate 10 in West El Paso within the UTEP Campus. Some of the elements included geometric design of roundabout, signage, and striping, drainage design, extensive topo, improvement & ROW boundary surveys that were done for private properties and the University, as well as for ROWs of City streets, IH-10, UPRR, and IBWC. The project required extensive utility coordination, extensive 3-D modeling to show existing utilities for the project area under the planned roadway improvements with replacement or protection measures; and the design of MSE Walls for the roundabout and 3-way access pedestrian tunnel. As-builts & field data were used to locate utilities.